Remote Leak Detection Panel: installation.
A walkthrough for contractors and installers: mounting and power, zone and relay wiring, LD1 and LD2 leak detectors, labeling the zones, BMS connections and testing.
Chapters
Safety: installation by qualified personnel only, following the NEC and local codes. Install the panel in a dry location and de-energize and lock out panel power before wiring. Relay outputs are for Class 2 circuits only.