# Pythia Technologies — Smart Panels Guide For the SPAC4, SPAC4-LED, SPDM, SPDM-ND, SPDM-CELL and SPIGM · Revision 2026-11-19 · pythiatech.com/panels --- # [USE] How to use this guide **This guide is written so an AI assistant can read it for you.** Give it to an assistant such as Claude, ChatGPT, Microsoft Copilot or Google Gemini and ask your question in plain words. The assistant answers from these pages and can walk you through each step. The printed installation guide for each Smart Panel is made from the same text. This guide covers **installing** a Smart Panel: mounting, power, wiring, the network connection, first setup and testing. The software inside every Smart Panel is the Pythia DM, and the console is covered in detail in the **DM Series Guide** (Pythia_Tech_DM_Series.txt on pythiatech.com). Section tags such as [SPA-4] or [INTG-5] refer to that guide. ## [USE-1] Questions you can ask - "Which Smart Panel do I need for two CRAC units that should rotate every week?" - "How do I wire a CRAC's summary alarm and its remote on/off to the SPAC4?" - "How do I connect my laptop to the panel for the first time?" - "What do I need from the IT team before I install an SPDM?" - "Which wires from the old SiteLink go where on the SPIGM?" - "Give me the BACnet point list for the SPAC4 for our BMS integrator." - "How do I test the panel before I leave the site?" ## [USE-2] Tips - **Say which panel you have.** The model is on the order and the product label: SPAC4, SPAC4-LED, SPDM, SPDM-ND, SPDM-CELL or SPIGM. - **Ask for step-by-step instructions** when you want to follow along. - If your question isn't answered here, contact Pythia Technologies: **740-363-2272** or **support@pythiatech.com**. --- # [AIX] Instructions for AI assistants You are helping a user install, wire, set up or integrate a Pythia Technologies Smart Panel. Follow these rules. 1. **Answer from this document.** Cite the section ID in brackets, e.g. "(see [AC4-4])". For console and software questions, use the DM Series Guide (Pythia_Tech_DM_Series.txt) if you have it, and cite its section IDs. If neither document covers something, say so and suggest contacting Pythia Technologies (740-363-2272, support@pythiatech.com). Don't guess at defaults, terminal numbers or behavior. 2. **Identify the panel.** Part 1 ([SPC]) applies to every Smart Panel. The SPAC4 and SPAC4-LED are covered in [AC4], the SPDM, SPDM-ND and SPDM-CELL in [SDM], and the SPIGM in [IGM]. If the user hasn't said which panel they have and it matters, ask. 3. **Safety first.** Before wiring steps, repeat the safety points in [SPC-2]: qualified personnel, NEC and local codes, power locked out, voltage-free contacts only on alarm inputs, Class 2 circuits only on relays. 4. **Never tell anyone to apply voltage to an alarm input.** Alarm inputs accept voltage-free (dry) contacts only. 5. **Never tell anyone to change Network Interface 1** on the DM processor. It is the panel's internal link ([SPC-6]). 6. **Don't claim certifications or listings** that aren't stated here. The enclosure facts are in [SPC-1]. Never say a panel is "BTL listed" or "UL listed". 7. **Use the exact labels.** Bold text is exactly what is printed on the panel, its terminals, its labels or the console. 8. **Keep answers short and practical.** Give steps, then offer to explain further. --- # [FAM] The Smart Panel family Every Smart Panel is a Pythia DM in a wall-mount enclosure: the same software as a Pythia DM server, with its own inputs or equipment connections, and one network connection to the site. | Panel | Models | Built for | Equipment connections | At the panel | |---|---|---|---|---| | Smart Panel AC4 | SPAC4, SPAC4-LED | Automatic changeover, failover and temperature staging for up to four CRACs, rooftop units or pumps | 4 unit alarm inputs, 4 unit control relays, 2 temperature sensors, common alarm relay | SPAC4: iPad display. SPAC4-LED: unit LEDs | | Smart Panel DM | SPDM, SPDM-ND, SPDM-CELL | A complete DM for a room or site without a server rack | Networked equipment over Modbus/TCP, BACnet/IP and SNMP, plus 8 onboard inputs and a common alarm relay | SPDM: iPad display. SPDM-ND: no display | | Smart Panel IGM | SPIGM | Liebert equipment with IGM interfaces; replaces a Liebert SiteLink | Up to 12 Liebert IGM units on the existing RS-422 IGM wiring | No display or door indicators; status is in the browser | - **SPDM-CELL** is an SPDM with a cellular router and an outdoor antenna, for sites without a usable network ([SDM-8]). **SPDM-STAR** adds Starlink instead. - The **DM AI Connector** is available for every Smart Panel. It lets Claude, ChatGPT or any MCP assistant answer from the panel's live data, and it is read-only by default (DM Series Guide [AIC]). Product pages: pythiatech.com/smart-panel-ac4, pythiatech.com/smart-panel-igm and pythiatech.com/pythia-dm (Smart Panel DM). All panels: pythiatech.com/panels. --- # PART 1 — COMMON TO EVERY SMART PANEL # [SPC] Installation basics ## [SPC-1] Specifications | Item | Specification | |---|---| | Inside | A Pythia DM processor running the DM software, a 24 VDC DIN-rail power supply (two on the SPIGM), field terminal blocks and, on most models, a panel LAN | | Network | One connection to the site network: **Port 0** on the DM processor (on the SPDM-CELL, the cellular router) | | Console | Web console and Alarm View over HTTPS in any modern browser. Nothing to install on operators' PCs | | Publishing | BACnet/IP device, Modbus/TCP server and SNMP v1/v2c/v3 agent (SNMPv3 with SHA-256 authentication and AES-128 encryption), standard on every model. Email and SNMP trap notifications (SNMP v1, v2c or v3) | | Panel power | 100–240 VAC input, 1.8 A max per supply, to a 24 VDC DIN-rail supply. 24 VAC and 48 VDC options on the SPAC4 and SPDM. The DM processor requires UPS- and/or inverter-protected power | | Enclosure | Wall-mount ABS, IP67, UL94-V0. Meets or exceeds the UL 508A Open Industrial Control Panel standard | | Size | SPAC4: 16.25 × 13 × 7.5 in. SPIGM: 510 × 410 × 200 mm | | Environment | −30 to 45 °C (−22 to 113 °F) inside the enclosure; 5 to 95% RH, non-condensing | ## [SPC-2] Safety - Installation must be done by **qualified personnel**, following the **NEC** and all local codes. - **De-energize and lock out** panel power before wiring, and follow the equipment manufacturer's procedures when working at the monitored or controlled equipment. - Alarm inputs accept **voltage-free contacts only**. Never apply voltage to an input. - Output relays are for **Class 2 circuits only**. - On the SPAC4, a unit control relay turns real equipment on and off. Agree with the site before testing a relay ([AC4-13]). ## [SPC-3] What you need | Item | Use | |---|---| | Panel power | A 120 VAC circuit (100–240 VAC), UPS- or inverter-protected; or 24 VAC or 48 VDC if that option was ordered | | One network drop | Port 0 to the site network, with an IP address, subnet mask and gateway from the site's IT team ([SPC-10]) | | A laptop and a network cable | First connection and setup ([SPC-7]) | | Belden 6300UE | Dry-contact inputs and relay outputs, up to 1,000 ft (SPAC4, SPDM) | | Type II 10K thermistors | Temperature inputs (SPAC4, SPDM). The SPAC4 includes one TS1 wall sensor ([AC4-5]) | | The existing IGM pairs | Liebert IGM wiring (SPIGM) | | At the equipment | A voltage-free dry contact for each alarm, and whether it is normally open or normally closed (SPAC4, SPDM) | ## [SPC-4] Mounting Mount the panel on a wall in the room it serves, or where people will see it. Make sure the door opens fully and the display or LEDs are visible. Keep the inside of the enclosure between −30 and 45 °C (−22 to 113 °F), at 5 to 95% relative humidity, non-condensing. ## [SPC-5] Panel power Bring 100–240 VAC to the **L** and **N** terminals of the panel's power supply and ground the panel per code. The supply draws 1.8 A at most. Apply power; the DM processor starts, and on the SPAC4 and SPDM the green **POWER** light on the door comes on. > **Important:** The DM processor requires **UPS- and/or inverter-protected** power. A panel that loses power stops monitoring until power returns. Panels ordered for 24 VAC or 48 VDC have a matching supply in the same position. The SPIGM has two 24 VDC supplies, each with its own 100–240 VAC input. ## [SPC-6] The DM processor and its ports The DM processor is the small finned computer inside the panel. Its network ports are on the bottom edge, labeled **0** and **1**. | Port | Console name | Use | |---|---|---| | **0** | Network Interface 0 | The panel's one connection to the site network. The console, notifications, equipment polling and BACnet/IP, Modbus/TCP and SNMP publishing all use it | | **1** | Network Interface 1 | The **panel LAN**: the panel's own internal network, factory wired by Pythia. On the SPIGM it joins the built-in switch and the twelve IGM channels; on the SPAC4 and SPDM it links the processor to its I/O controller and the display | > **Important:** Do not change **Network Interface 1**, and do not connect the panel LAN to the site network. Change only **Network Interface 0** ([SPC-9]). ## [SPC-7] Connecting a laptop Connect your laptop to **Port 0** with a network cable and give the laptop an address on the same subnet: | | IP address | Subnet mask | Gateway | |---|---|---|---| | Panel default | 192.168.0.221 | 255.255.255.0 | 192.168.0.100 | | Your laptop (example) | 192.168.0.100 | 255.255.255.0 | — | Browse to **http://192.168.0.221**. On the SPDM and SPIGM this opens the **Alarm View**; on the SPAC4 and SPAC4-LED it opens the **live status page**. Neither needs a sign-in. If the page does not load, check the laptop's address, the cable and that you are on Port 0. On the SPDM-CELL, connect to the cellular router instead ([SDM-8]). ## [SPC-8] Signing in Click **Console** (lower right) to open the configuration console. The default user name is **admin** and the default password is **admin**. > **Important:** Change the admin password before the panel goes on the site network, and give each person their own account (DM Series Guide [USR]). ## [SPC-9] Changing the IP address 1. In the console tree, open **Settings › Network Interfaces** and select interface **0**. 2. Under **IP Addresses**, enter the new IP address, subnet mask and gateway from the site's IT team. Use **+ Add IP** for another address. The DHCP switch and DNS server are on the same page. 3. Click **Apply & Restart**. The panel restarts on the new address; reconnect your browser to it. Set the time zone and time source under **Settings › Time**, and the outgoing email relay under **Settings › SMTP Relay** (DM Series Guide [SET-7], [SET-8]). ## [SPC-10] For the IT team Each panel needs one network drop, an IP address and the services the site will use. Defaults are shown; open only the services the site uses. | Service | Default | Direction | |---|---|---| | Web console and Alarm View | HTTPS, TCP 443 | To the panel | | BACnet/IP | UDP 47808 | Both | | Modbus/TCP | TCP 502 | Both | | SNMP | UDP 161 | Both | | SNMP traps | UDP 162 | From the panel | | Email notifications | Through the site's SMTP relay | From the panel | "Both" covers the panel polling networked equipment and the BMS or NMS reading the panel. The SPAC4 and SPIGM poll no equipment over the site network, so for them "Both" is only the BMS or NMS reading the panel. ## [SPC-11] The door: indicators, buzzer and acknowledge (SPAC4 and SPDM) - **ALARM** (red) and **POWER** (green) lights, and a buzzer. - **HOLD TO ACKNOWLEDGE:** when an alarm occurs, the ALARM light and buzzer come on. Press and hold the button to silence the buzzer and acknowledge. - The buzzer can be enabled or silenced, and the alarm delay set, in the Smart Panel **Properties** in the console (SPAC4: [AC4-9] and DM Series Guide [SPA-8]; SPDM: DM Series Guide [SPD-1.1]). ## [SPC-12] The front-panel display (SPAC4 and SPDM) The SPAC4 and SPDM have an iPad mounted in the door. It shows the panel's own web page in the Safari browser: the live status page on the SPAC4, the Alarm View on the SPDM. It reaches the panel over the panel LAN, so it needs no site network. The same pages are available from any browser at the panel's address. > **Note:** If the iPad's battery has been completely drained, it can take up to 15 minutes to charge before it powers on. ## [SPC-13] Recommended cable | Connection | Cable | |---|---| | Dry-contact inputs and relays (SPAC4, SPDM) | Belden 6300UE, up to 1,000 ft | | Temperature sensors (SPAC4, SPDM) | Belden 6300UE to a Type II 10K thermistor | | Ethernet (Port 0, networked equipment) | CAT5e or better | | Liebert IGM (SPIGM) | The existing RS-422 IGM pairs | ## [SPC-14] BMS and NMS integration Every Smart Panel publishes its points as a **BACnet/IP device**, a **Modbus/TCP server** and an **SNMP v1/v2c/v3 agent** at the same time, from Port 0. The point lists are in the console under **Settings › Mappings**, one page per protocol, and each list can be exported as CSV, PDF, Excel, HTML or JSON (BACnet/IP also as EDE) for the integrator. - The **SPAC4** uses a fixed point list, the same on every panel ([AC4-14]). - The **SPDM** and **SPIGM** build their maps from the units added to them, numbered by unit (DM Series Guide [INTG]). - Writes from the BMS are off until you allow them (DM Series Guide [INTG-2.2]). - The panel publishes **one** BACnet/IP device. Its BACnet conformance statement (PICS) is published on pythiatech.com. ## [SPC-15] Software: the DM Series Guide Everything after the panel is installed and on the network is done in the DM console: units, alarms, notifications, trends, users, mappings and the AI Connector. The DM Series Guide covers it step by step. The parts to start with: | To do this | DM Series Guide | |---|---| | Find your way around the console | [GS], [CON] | | Add equipment (SPDM, SPIGM) | [MON-4.2], [UNIT] | | Use the panel's own inputs (SPDM) | [SPD] | | Set up an SPAC4's groups and units | [SPA] | | Send alarm emails and SNMP traps | [AUT] | | Publish to a BMS or NMS | [INTG] | | Connect an AI assistant | [AIC] | Training videos for the DM console: pythiatech.com/resources (Training videos). ## [SPC-16] Troubleshooting | What you see | What to check | See | |---|---|---| | No **POWER** light (SPAC4, SPDM) | Panel power at the supply's **L** and **N** terminals; the supply's output | [SPC-5] | | The page at 192.168.0.221 won't load | Laptop on **Port 0**, laptop address 192.168.0.100 with mask 255.255.255.0, the cable; the panel may already have a site address | [SPC-7] | | The page loads but the console sign-in fails | User **admin**; the password may have been changed | [SPC-8] | | The panel is unreachable after an address change | Reconnect to the new address; make sure only Network Interface 0 was changed | [SPC-9] | | The iPad is dark | Charge it for up to 15 minutes | [SPC-12] | | A dry-contact input never alarms | Wiring on the **two lower screws**; the input's NO/NC setting matches the contact | [AC4-4], [SDM-5] | | The BMS can't read the panel | Port 0 address, the firewall services in [SPC-10], and the map in **Settings › Mappings** | [SPC-14] | | A Liebert unit shows communications lost | Its IGM pair on the right channel, red (+) on top, black (−) on the bottom; the driver | [IGM-4], [IGM-7] | --- # PART 2 — SMART PANEL AC4 (SPAC4, SPAC4-LED) # [AC4] Smart Panel AC4 ## [AC4-1] What it is The Smart Panel AC4 runs a team of up to **four** CRAC units, rooftop units, condensers or pumps. It watches each unit's summary alarm and turns units on and off through its own relays for **failover**, **automatic changeover** (lead and standby rotation), **temperature staging** and a scheduled **standby exercise**. It is a direct, modern replacement for the legacy Liebert AC4 changeover panel, and works with each unit's existing summary alarm contact and remote on/off control. The four units are split into **one or two groups**. Each group has its own failover, changeover schedule, staging and sensor. ## [AC4-2] Two models | | SPAC4 | SPAC4-LED | |---|---|---| | At the panel | iPad display in the door showing the live status page | An LED for each of the four units with a write-on label, and a **Unit Hold** LED | | Setup | At the panel on the iPad, or from a laptop or any browser | From a laptop or any browser, through Port 0 | | Wiring, settings and integration | Identical | Identical | Both models have the **ALARM** and **POWER** lights, the buzzer and the **HOLD TO ACKNOWLEDGE** button. ## [AC4-3] Inside the panel and the field terminals Inside the panel are the DM processor, the I/O module, the field terminals, the power supply, the Ethernet adapter, the display's power supply (SPAC4), the buzzer and the door indicators. The field terminals are, from left to right: **UNIT 1–4 ALARM INPUT**, **TEMPERATURE SENSOR 1** and **2**, the **COMMON ALARM RELAY**, and **UNIT 1–4 RELAY**. > **Important:** Field wiring lands on the **two lower screws** of each input terminal block. The upper screws are factory wired. Relay terminals **A1** and **A2** are the relay coil and are also factory wired. ## [AC4-4] Unit alarm inputs Wire each unit's **summary alarm** to its **UNIT n ALARM INPUT**: a voltage-free dry contact only, up to 1,000 ft on Belden 6300UE. Never apply voltage to an input. Unit Alarm Inputs 1–4 are **Unit-1** through **Unit-4** in the console. ## [AC4-5] Temperature sensors Only **Type II 10K** thermistors are supported, for temperature staging. **TEMPERATURE SENSOR 1** is Group 1's sensor and **TEMPERATURE SENSOR 2** is Group 2's. A group without its own sensor can use the other group's ([AC4-10], Sensor Source). Each SPAC4 ships with **one TS1** wall-mount 10K temperature sensor, normally wired to **TEMPERATURE SENSOR 1**. For a second group with its own sensor, order a second TS1. Mount it on an interior wall in the room the units cool, about 5 ft above the floor and out of supply air and sunlight. The thermistor is not polarized; land the two conductors on the two lower screws and ground the cable shield at the panel only. The TS1 brochure has the full mounting and wiring steps and a resistance table for checking a sensor with a meter. ## [AC4-6] Unit control relays Each **UNIT n RELAY** turns its unit on and off through the unit's remote on/off control input. Each relay has normally open and normally closed contacts rated **250 VAC/6 A** and **30 VDC/6 A**, **Class 2 circuits only**. | Terminal | Function | Use for | |---|---|---| | 11 | Common | Both connections | | 14 | Normally Open (NO) | Wire 11–14 for a normally open contact | | 12 | Normally Closed (NC) | Wire 11–12 for a normally closed contact | Set the unit's **Connection** setting to match the wiring ([AC4-11]). ## [AC4-7] Common alarm relay The **COMMON ALARM RELAY** switches when the panel alarms. Use it for a BMS input or a building annunciator. It has normally open and normally closed contacts with the same rating and terminal numbers as the unit relays ([AC4-6]). ## [AC4-8] The live status page Browse to the panel's address (no sign-in) to see the live status page. It is the same page the SPAC4's iPad shows, and it updates every 2 seconds. - **Header:** the clock and the overall panel status. - **Group cards:** each assigned unit with its role (**Primary** or **Standby**) and state (**Running**, **Off** or **Alarm**). - **Group details:** failover, auto sequencing, the last changeover, run hours and unit hold. - **Staging:** the group's temperature, staging status and current stage. - **Indicators:** **Alarm**, **Ack**, **Power** and **Comms**. - **Console** (lower right) opens the configuration console ([SPC-8]). The full description of every field is in the DM Series Guide [SPA-2]. ## [AC4-9] Setup order and panel settings Set up the panel in this order: **panel settings**, then **groups**, then **units**. Select **Smart Panel** in the console tree; both groups' settings are on this page. Click **Properties** (upper right) for the panel settings: | Setting | Meaning | |---|---| | **Enable/Silence Buzzer** | Enable or disable the alarm buzzer | | **Acknowledge Alarm and Unlatch** | Acknowledges alarms and resets latched alarms remotely | | **Alarm Delay Time in Seconds** | How long an alarm must be present before it is recognized | | **Unit Cycle Hold Time in Minutes** | The settling period, 10 minutes by default. Whenever the panel switches a unit on or off, that unit's group is held for this time ([AC4-12]) | | **Panel Status** | The overall panel status (read-only) | Click **Save** to apply the settings, or **Close** to leave without saving. ## [AC4-10] Group settings A group defines failover, auto sequencing and staging for the units assigned to it. All four units can be in one group, or divided between Group 1 and Group 2. For example configurations, see the Smart Panel AC4 brochure. Group settings are edited on the **Smart Panel** page (or with **Properties** on a group's own page). **Failover** - **Failover:** start a standby unit when a running unit alarms. - **Latch Primary Alarm:** after the primary's fault clears, the standby stays in charge until the alarm is acknowledged. - **Latch Primary On:** the primary keeps running while its alarm is active, alongside the standby. **Auto Sequencing** - **Auto Sequencing:** choosing any schedule enables rotation of lead and standby, for example every N days ("Days - 1" is daily), a day of the week or a day of the month. - **Auto Sequencing Hour** / **Minute:** the time of the changeover. - **Auto Sequencing Rotate:** rotates the units now, regardless of the schedule. - Auto sequencing must be enabled for rotation to occur, and rotation does not take place while the unit hold time is active. **Staging** - **Staging:** choosing any option enables staging. **Staging Up** is for cooling; **Staging Down** is for heating. - **Staging Setpoint 1–4:** each setpoint brings on one more unit. - **Staging Range:** the change in temperature before a stage is exited, which prevents rapid cycling. - **Staging Sensor:** the sensor type (Type II 10K, °F or °C). - **Staging Alarm:** enables the staging alarm. - **Sensor Source:** **Local Sensor**, or **Use Other Group Sensor if Not Detected**. - **Sensor Status:** the sensor in use, for example "Detected" or "Using Group 1 Sensor". **General:** **Description**, user defined. Click **Save** on the group to apply, or **Cancel**. On a group's Properties dialog, **Restore Defaults** resets the group and removes its units; it cannot be undone. ## [AC4-11] Unit settings Units are **Unit-1** through **Unit-4** and match the physical inputs and relays. To add a unit to a group, open the group in the tree and click **Add**. A unit can belong to only one group; to move it, remove it from its group first. | Setting | Meaning | |---|---| | **Mode** | **Primary**: the unit runs. **Standby**: off unless needed (failover or staging), or during its scheduled run. **On**: forced on regardless of the group. **Off**: forced off, for example for maintenance | | **Connection** | **Normally Open** or **Normally Closed**. Must match the unit's wiring to its control relay ([AC4-6]) | | **Schedule** | Enables a scheduled run for a **Standby** unit (standby exercise) | | **Schedule Hour** | The start hour, 0–23 | | **Schedule Run Time** | The run time in minutes, 0–59 | | **Description** | User defined; typically the unit's name, such as CRAC-01 | Click **Save** on each unit card, or **Cancel**. ## [AC4-12] How the panel behaves - **Forced Off:** a unit set to **Off** stays off until its Mode is changed to On, Primary or Standby. Use it to shut a unit down for maintenance. - **Forced On:** a unit set to **On** stays on until its Mode is changed. Use it to keep a unit running while another is serviced. - **Unit hold (settling period):** whenever the panel switches a unit on or off, that unit's group is held for the **Unit Cycle Hold Time** (10 minutes by default). During the hold, the panel ignores the units' fail alarms and makes no automatic changes (no failover, staging or rotation), so start-up and shut-down transients can't cause false alarms or unnecessary switching. The **Unit Hold** chip, or the **Unit Hold** LED on the SPAC4-LED, shows when a hold is active. - **After a failover:** without latching, the panel hands back to the primary once its fault clears. With **Latch Primary Alarm**, the standby stays in charge until the alarm is acknowledged, at the panel or with **Acknowledge Alarm and Unlatch**. With **Latch Primary On**, the primary keeps running alongside the standby while its alarm is active. - **Standby exercise:** a Standby unit with a schedule starts at the set hour and runs for the set run time, up to 59 minutes, so a seized fan or stale coil shows up before it is needed. - **Staging during a fault:** if staging needs more units than are healthy, it will also call on units in alarm, following the staging setup. - **Sharing a sensor:** a group set to **Use Other Group Sensor if Not Detected** uses the other group's sensor while its own is missing. ## [AC4-13] Commissioning test Agree with the site before you start: these steps turn real equipment on and off. 1. **Relays.** Set each unit's Mode to **On** and confirm the unit starts. Set it to **Off** and confirm it stops. Then set it back to **Primary** or **Standby**. 2. **Failover.** Trip the primary unit's summary alarm. After the alarm delay, confirm the standby unit starts, the **ALARM** light and buzzer come on, and the common alarm relay changes state. 3. **Acknowledge.** Press and hold **HOLD TO ACKNOWLEDGE** and confirm the buzzer stops. Clear the unit's alarm and confirm the panel returns to normal. 4. **Rotation.** Use **Auto Sequencing Rotate** and confirm the roles swap. 5. **Sensors.** Confirm each group's temperature reads correctly. 6. **BMS.** Have the integrator read a few points ([AC4-14]). ## [AC4-14] BMS points BACnet/IP, Modbus/TCP and SNMP are standard on every SPAC4 and publish the same points with the same numbers. The lists are in **Settings › Mappings** and can be exported ([SPC-14]). - **BACnet/IP:** one device, device name "Smart Panel", model "SPAC4". The default device instance is **1**; the instance and port are set under **Properties** on the BACnet/IP mapping page. Each point is an **Analog Value** whose instance is the point number (for example **AV 1101** = Group 1 Unit 1 state). - **Modbus/TCP:** unit ID (address) **1**. Holding registers are **40000 + the point number** (for example **41101** = Group 1 Unit 1 state). Group sensor values are also available as an IEEE float register pair (41002–41003, 42002–42003) in engineering units, or as an integer × 0.01. - **SNMP v1/v2c/v3:** OIDs are **1.3.6.1.4.1.38801.6..0** (for example 1.3.6.1.4.1.38801.6.1101.0 = Group 1 Unit 1 state). The MIB file (pythiatechspac4.mib) is available from Pythia. SNMPv3 users (authentication MD5, SHA-1 or SHA-256; encryption DES or AES-128) are added in the panel console under **Settings › SNMP Settings**, where the standard Pythia MIB files (PYTHIA-MIBS.zip) can also be downloaded. The panel can also send SNMP traps (v1, v2c or v3) and email. **Mode** points are read/write (where writes are enabled); all other points are read-only. | Point | Modbus | BACnet | SNMP suffix | Values | |---|---|---|---|---| | Panel communications | 40001 | AV 1 | .6.1.0 | 0 = normal, 1 = loss of communications | | Panel state | 40002 | AV 2 | .6.2.0 | 0 = disabled, 1 = normal, 2 = alarm | | Group 1 state | 41001 | AV 1001 | .6.1001.0 | 0 = disabled, 1 = normal, 2 = alarm | | Group 1 sensor | 41002 | AV 1002 | .6.1002.0 | Temperature, engineering units | | Group 1 Unit n state | 41n01 | AV 1n01 | .6.1n01.0 | 0 = not assigned, 1 = normal, 2 = alarm | | Group 1 Unit n on | 41n02 | AV 1n02 | .6.1n02.0 | 0 = off, 1 = on | | Group 1 Unit n mode (R/W) | 41n03 | AV 1n03 | .6.1n03.0 | 0 = off, 1 = on, 2 = standby, 3 = primary | | Group 2 state | 42001 | AV 2001 | .6.2001.0 | 0 = disabled, 1 = normal, 2 = alarm | | Group 2 sensor | 42002 | AV 2002 | .6.2002.0 | Temperature, engineering units | | Group 2 Unit n state | 42n01 | AV 2n01 | .6.2n01.0 | 0 = not assigned, 1 = normal, 2 = alarm | | Group 2 Unit n on | 42n02 | AV 2n02 | .6.2n02.0 | 0 = off, 1 = on | | Group 2 Unit n mode (R/W) | 42n03 | AV 2n03 | .6.2n03.0 | 0 = off, 1 = on, 2 = standby, 3 = primary | In the table, **n** is the unit number 1–4. For example, Group 2 Unit 3 mode is Modbus **42303**, **AV 2303**, SNMP 1.3.6.1.4.1.38801.6.2303.0. ## [AC4-15] Training video and documents - Installation and setup training video (about 12 minutes): **pythiatech.com/training/spac4** - Brochure and this guide: **pythiatech.com/smart-panel-ac4** - TS1 temperature sensor brochure, with specifications and install steps: **pythiatech.com/smart-panel-ac4** - Console reference: DM Series Guide [SPA] --- # PART 3 — SMART PANEL DM (SPDM, SPDM-ND, SPDM-CELL) # [SDM] Smart Panel DM ## [SDM-1] What it is The Smart Panel DM is a complete Pythia DM in a wall-mount panel, for electrical rooms, closets, remote sites and any room without a server rack. It is not a gateway that reports to a server: it is a DM, running the same software, with its own inputs. It polls the room's networked equipment (UPS, PDU, cooling, transfer switches) over Modbus/TCP, BACnet/IP and SNMP, reads its own dry-contact and temperature inputs, and publishes everything to the BMS and NMS from one connection. A head-end DM can bring many panels together. ## [SDM-2] Models | Model | Difference | |---|---| | **SPDM** | iPad display in the door showing the Alarm View | | **SPDM-ND** | The same panel with no display; functionally identical | | **SPDM-CELL** | Adds a cellular router and an outdoor antenna, for sites without a usable network ([SDM-8]) | | **SPDM-STAR** | Adds Starlink connectivity | Each SPDM is a single DM, licensed on its own. For a standby copy, choose a redundant pair of Pythia DM servers instead. ## [SDM-3] Inside the panel Inside the panel are the DM processor, the I/O module (a Pythia CM06P) that reads the field inputs, the field terminals, the common alarm relay, the 24 VDC power supply and the door indicators, plus the display and its Wi-Fi adapter on the SPDM and the cellular router on the SPDM-CELL. The DM processor reads the I/O module over the panel LAN; all of this is factory wired. ## [SDM-4] Field terminals The panel has **eight onboard inputs**. By default there are six dry-contact inputs and two temperature inputs; an eight-dry-contact version is available, and custom input configurations can be ordered. | Configuration | Terminals, left to right | |---|---| | Default | **INPUT 1–6** (dry contact), **SENSOR 1** and **SENSOR 2** (10K thermistor), **COMMON ALARM**, **PTECH ONLY** | | Eight dry contacts (option) | **INPUT 1–8** (dry contact), **COMMON ALARM**, **PTECH ONLY** | > **Important:** Field wiring lands on the **two lower screws** of each input terminal block; the upper screws are factory wired. Do not connect anything to the **PTECH ONLY** terminal. Relay terminals **A1** and **A2** are the relay coil and are factory wired. ## [SDM-5] Dry-contact inputs Voltage-free dry contacts only: an alarm or status contact from a transfer switch, generator, door, leak detector or any other equipment. Normally open and normally closed contacts are both supported. Up to 1,000 ft on Belden 6300UE. Never apply voltage to an input. Equipment with a network interface needs no wiring to the terminals: the SPDM polls it over the network ([SDM-10]). Use the terminals for equipment that only offers dry contacts. ## [SDM-6] Temperature inputs **SENSOR 1** and **SENSOR 2** take **Type II 10K** thermistors. ## [SDM-7] Common alarm relay The **COMMON ALARM** relay is an output for a BMS input or a local alarm. Contacts are rated **250 VAC/6 A** and **30 VDC/6 A**, Class 2 circuits only. | Terminal | Function | |---|---| | 11 | Common | | 14 | Normally Open (NO): wire 11–14 | | 12 | Normally Closed (NC): wire 11–12 | ## [SDM-8] SPDM-CELL: cellular The SPDM-CELL adds a cellular router inside the panel and an outdoor, omni-directional antenna for 2G, 3G, 4G and 5G (617–2700 MHz), with an N-female connector and mounting hardware. - **Antenna:** mount it outdoors, or where the cellular signal is strongest, and run its cable to the connector on the bottom of the panel. - **Laptop connection:** connect your laptop to **port 2** on the top of the cellular router. The router gives the laptop an address (DHCP). Then browse to **http://192.168.0.221** as in [SPC-7]. - **Remote access:** a static IP plan comes from Pythia or the customer. Remote access is limited by firewall rules at both ends. ## [SDM-9] Using the panel's inputs in the DM A panel input becomes useful once a unit watches it. In the console: 1. **Map the input** on the **Smart Panel** page so the DM reads it (DM Series Guide [SPD-1.2]). 2. **Bring it into a unit** with the **DIRS** driver as a data point, an alarm, or both, so it gets alarms, notifications, trends and BMS mapping ([SPD-2]). Set the buzzer, the alarm delay and which alarm categories sound the buzzer in the Smart Panel **Properties** ([SPD-1.1]). ## [SDM-10] Adding networked equipment Each UPS, PDU, cooling unit or transfer switch with a network interface is added as a unit with its DM driver, its network and its IP address (DM Series Guide [MON-4.2], [UNIT]). The equipment must be reachable from Port 0. Pythia confirms the driver for each device; send the equipment list when planning the site. ## [SDM-11] Commissioning test 1. **Inputs.** Change each dry contact at the equipment (or jumper the input) and confirm the input and its alarm change in the console. 2. **Sensors.** Confirm each temperature reads correctly. 3. **Equipment.** Confirm each networked unit shows live readings and no communications alarm. 4. **Alarm.** Trigger one alarm: confirm the **ALARM** light and buzzer, the common alarm relay and the email or SNMP trap. Press and hold **HOLD TO ACKNOWLEDGE**. 5. **BMS.** Have the integrator read a few points from **Settings › Mappings** ([SPC-14]). ## [SDM-12] Documents - Connection diagram and deployment options: **pythiatech.com/pythia-dm** - Smart Panel connections brochure (drawings and network requirements): pythiatech.com/resources - Console reference: DM Series Guide, especially [SPD], and the DM training videos at pythiatech.com/resources --- # PART 4 — SMART PANEL IGM (SPIGM) # [IGM] Smart Panel IGM ## [IGM-1] What it is The Smart Panel IGM connects up to **twelve** Liebert units over the RS-422 **IGM** wiring already in the building. It takes a Liebert SiteLink's place on the same wiring, reads each unit in its native IGM protocol with a Liebert driver, and gives every unit a dashboard, alarms, notifications and trends, published to the BMS and NMS. It is a complete Pythia DM: no separate server is needed. ## [IGM-2] Inside the panel - **Twelve IGM channel modules** (MS0-MBT), one Liebert unit per channel, wired to terminals **MODBUS/IGM 01–12**. - The **DM processor**. - A **built-in Ethernet switch**. The twelve IGM channels and the DM processor's Port 1 share it as a private **panel LAN**, isolated from the site network. It does not connect to the site network. - **Two 24 VDC power supplies**, each with a 100–240 VAC input (1.8 A max per supply). The SPIGM door has no display or indicators: unit status, alarms and settings are in the browser (the Alarm View and the console). Port 0 on the DM processor is the panel's only connection to the site network ([SPC-6]). ## [IGM-3] Before you start: identify the units Pythia's **IGM discovery tool** reads each unit on its IGM wiring and reports which DM driver to use. It only reads from the unit and never changes it. Send Pythia the results, or the list of Liebert equipment and model numbers, before the installation so the drivers can be confirmed. Contact Pythia technical support for the tool. > **Note:** Vertiv equipment that uses the Velocity protocol is not currently supported by the SPIGM's IGM channels. Please contact Pythia Technologies to discuss alternative integration options. ## [IGM-4] Wiring the IGM pairs 1. Label each IGM pair at the old SiteLink with the unit it serves before you disconnect it. 2. Land each unit's pair on its own channel, **MODBUS/IGM 01** to **MODBUS/IGM 12**: the **red wire (+)** on the **top** screw and the **black wire (−)** on the **bottom** screw. 3. Record which unit is on which channel. You need it when adding the units ([IGM-7]). No new communication runs to the equipment are needed when the IGM wiring is reused. ## [IGM-5] Prefer Ethernet: an MS0-MBT in the unit Where the Liebert unit allows it, an **MS0-MBT** gateway can be fitted inside the unit and a network cable run back to the panel, instead of reusing the serial IGM pair. It's a good option when the existing IGM wiring is damaged, undocumented or no longer usable. Contact Pythia to plan it. ## [IGM-6] Supported equipment Each Liebert type has its own DM driver, so its readings, alarms and controls arrive with the right names and units. Point sets can vary with equipment options and driver version. | Liebert equipment | Driver | What you see | |---|---|---| | Deluxe System/3 CRAC | LAM | Unit drawing, readings, alarms, controls | | Mini-Mate2 ceiling-mount cooling | MM2 | Unit drawing, readings, alarms, controls | | Precision cooling, Level 0 / Level 10 | L00, L10 | Readings and alarms | | XD refrigerant chiller | XDC | Mode and readings | | Multi-Module UPS (Series 600/610) | MM4 | Online, on battery, output off; battery state | | Single-Module UPS with static bypass | SM4 | Adds on bypass | | UPS System Control Cabinet | SC4 | System state and up to six module tiles | | NPower UPS, SMS UPS | NPR, SMS | Readings and alarms | | Precision Power Center (PDU) | PMP, PMP2 | One-line; PMP2 adds THD, K-factor, crest factor | | Static Transfer Switch, STS2 | STS, ST2 | Two sources, preferred and on-load | | Leak detection, single or dual cable | WDU, WDU2 | Cable OK, leak or fault; leak distance | | RCM8 remote contact monitor, UVM8 universal monitor | RCM8, UVM8 | Readings and alarms | Controls on CRAC types such as the Deluxe System/3 and Mini-Mate2 are each disabled for outside writes until you enable them, and values outside a control's limits are refused. ## [IGM-7] Adding the units in the DM Once each unit's IGM pair is landed on its channel ([IGM-4]), add the unit in the DM console: 1. Follow the DM Series Guide steps for adding a new unit ([MON-4.2]). 2. Choose the unit's IGM channel, and select the Liebert IGM driver for that equipment: the one the discovery tool named ([IGM-3]) or the one in the table in [IGM-6]. 3. Save, and confirm live readings appear. The unit opens with its equipment dashboard (DM Series Guide [EQP]). Repeat for each channel. If a unit won't communicate, check its wiring and driver ([IGM-4]) or call Pythia technical support. ## [IGM-8] Commissioning test 1. **Communications.** Confirm every unit shows live readings and no communications alarm. 2. **Names.** Confirm each unit's name matches the equipment on its channel. 3. **Alarm.** Where the site allows it, trigger or simulate one unit alarm and confirm it in the Alarm View and the console, and that the email or SNMP trap arrives. 4. **BMS.** Have the integrator read a few points from **Settings › Mappings** ([SPC-14]). ## [IGM-9] Larger sites Larger sites add **IGM expansion panels**, without their own processor, connected to a primary SPIGM. Liebert units with an IP card can also be polled over the network by any DM. Custom Smart Panels can combine IGM channels, dry-contact inputs and a network switch in one panel (SPIGM-CUST). ## [IGM-10] Video and documents - Product video, brochure and this guide: **pythiatech.com/smart-panel-igm** - Connection diagram: pythiatech.com/resources - Console reference: DM Series Guide, especially [EQP] and [INTG] --- # [APX] About this document **Smart Panels Guide — Pythia Technologies SPAC4, SPAC4-LED, SPDM, SPDM-ND, SPDM-CELL and SPIGM.** Revision: 2026-11-19. This text file and the printed installation guides PTECH_Guide_SPAC4.pdf, PTECH_Guide_SPDM.pdf and PTECH_Guide_SPIGM.pdf are made from the same source. The DM software is covered in the DM Series Guide. Specifications are subject to change without notice. Pythia Technologies, Inc. · 7540 Sawmill Parkway, Suite E, Powell, Ohio 43065 · 740-363-2272 · support@pythiatech.com · pythiatech.com Liebert and Vertiv are trademarks of their respective owners.